Skip to content
910.524.2518
scott@r3painting.net
GET A FREE QUOTE
Home Painting Wilmington NC
  • Home
  • About Us
  • Gallery
  • Services
    • Interior Painting
    • Cabinet Painting
    • Popcorn Removal & Paint
  • Testimonials
  • Contact
CALL US
EMAIL US
Connect With Us
Home Painting Wilmington NC
  • Home
  • About Us
  • Gallery
  • Services
    • Interior Painting
    • Cabinet Painting
    • Popcorn Removal & Paint
  • Testimonials
  • Contact

Interior

Interiorimpactmedia2023-12-04T19:40:41+00:00

After

We painted walls, ceilings, trim, doors, kitchen and bathroom cabinets.

After

We painted walls

After

We painted walls

After

Popcorn removal and paint walls, ceiling and trim

After

We painted walls and trim

After

We painted walls and trim

After

We painted walls and trim

After

We painted walls and trim

After

Popcorn ceiling, trim and doors painted in gloss black, walls in a light beige

After

Popcorn ceiling, trim and doors painted in gloss black, walls in a light beige

After

Popcorn ceiling, trim and doors painted in gloss black, walls in a light beige

After

Popcorn ceiling painted with a gloss black

After

Wallpaper removal, prepare the walls and paint in this bathroom

After

Wallpaper removal, prepare the walls and paint in this bathroom

During

Another round of point up after the first coat in this bathroom.

After

After we removed the popcorn we painted the walls, ceiling and trim in this beach house. Trim and wall were painted the same sheen and color.

After

We cleaned up some rough drywall work and painted walls, ceiling and trim

After

We removed the popcorn and painted walls, ceiling, trim and doors throughout the house.

After

We removed the popcorn and painted walls, ceiling, trim and doors throughout the house.

After

After we removed the popcorn we painted the walls, ceiling and trim in this beach house. Trim and wall were painted the same sheen and color.

During

Ceiling being painted at the Murchison building downtown Wilmington

During

Ceiling being painted at the Murchison building downtown Wilmington

After

Ceiling at the Murchison building downtown Wilmington, NC.

Priming

Exterior ceiling being primed so that topcoat paint has better adhesion

Prepped & Ready

Stairwell prepped and first cut started

After

Prepped & Ready

Stairwell prepped and ready for first coat

After

We painted walls in this dining room

During

After

After we removed the popcorn we painted the walls, ceiling and trim in this beach house. Trim and wall were painted the same sheen and color.

After

After we removed the popcorn we painted the walls, ceiling and trim in this beach house. Trim and wall were painted the same sheen and color.

After

After we removed the popcorn we painted the walls, ceiling and trim in this beach house. Trim and wall were painted the same sheen and color.

Prepped

Commercial office needed skim coat prior to painting because what a large wall map had been removed it damaged the wall

Prepped & Ready To Spray

Prepped and ready to point up and spray / backroll the ceiling.

During

Prepping wallpaper to be painted over

Share This Story, Choose Your Platform!

FacebookTwitterRedditLinkedInWhatsAppTelegramTumblrPinterestVkXingEmail
© Copyright 2023 R3 Painting | Digital Marketing by Impact Media Solutions
FacebookYouTube
Page load link
Go to Top